May 1988 |
Started supplying of computer PSU as HONTEX ENGINEETING
LTD. |
May 1992 |
Started supplying PCBA for Analog Copying Machine |
June 1992 |
Kaga (H.K.) Electronics founded. |
August 1993 |
Stock share pacticipation with SHENZHEN SPEEDY-TECH |
January 1994 |
Merged HONTEX ENGINEERING LTD. |
September 1995 |
Implemented SMT line in SWENCO. |
May 1996 |
Started assembly of computer graphics card |
January 1998 |
Started supplying Digital Copying Machine PCBA. |
September 1999 |
Started producing CD-ROM finished product. |
September 1999 |
Kaga (Shenzhen) Electronics Ltd. production factory set up. |
May 2000 |
Kaga (Shenzhen) Electronics Ltd. obtained ISO-9002 certification. |
| Mar 2001 |
Stockshare participation in Hip Fung |
| Mar 2002 |
Kaga (Shenzhen) Electronics Ltd. obtained ISO-14001 certification. |
| May 2002 |
Installed X-ray in-line machine in own factory. |
| Nov 2002 |
Certification of ISO9001 (2000 version) for own factory. |
Aug 2003 |
Certification of ISO9001 in own factory. |
| Jan 2004 |
Installed the 8th SMT production line in own factory. |
| Feb 2004 |
Production started in the 2nd block of factory. |
| May 2004 |
Establish 100K clean room for projector F/G assembly. |
| Dec 2004 |
Installed the 9th SMT production line in own factory. |
| Feb 2005 |
Installed AOI inspection machine X-ray in-line machine and component analysis machine in own factory. |
| March 2005 |
Installed the 10th SMT production line in own factory. |
| Jun 2005 |
Installed the 11th SMT production line in own factory. |
| Dec 2005 |
Installed the 12th SMT production line in own factory. |
| Jan 2006 |
Installed the permanent temperature and moisture tank in own factory. |
Feb 2006 |
Installed the 13th SMT production line in own factory. |